Migration from IBM Cognos 8 to IBM Cognos 10

Summary

BGFi consulting has always responded to various requests from this luxury brand. Satisfied with the quality of the services and the good relationship with the technical teams, the company has chosen BGFi consulting to carry out this complex migration project.

Business Challenge

  • Upgrading IBM Cognos versions
  • Migrating from Access Manager to Active Directory
  • Centralize Security

Our Solution

  • A more powerful architecture
  • Centralized user and password management

International project management

The BGFi consulting team worked in an international context in collaboration with the project management based in New York.

At first, considered as a constraint, this dimension at the end has been an advantage allowing the teams to work in shifts and to optimize coordination of actions.

Migrating from IBM Cognos 8 to IBM Cognos 10

More than only the installation of a new version, this project was accompanied by an advisory phase on technical architectural decisions.

Supervised by the BGFi consulting experts, the DSI team was able to optimize the material resources: to create a balanced load between development, the recipe, production and other transition environments. Supported by a case study and prior knowledge of the existing environments, BGFi consulting was able to install and configure the new version of Cognos according to the precise needs of our client.

 

Technologies

  • IBM Cognos 10 BI and Enterprise Planning
  • BSP MetaManager
  • IBM Cognos Lifecycle Manager

Methodologies

Agile approach with best practices of SCRUM.

Other Key Elements

  • Project Management in the United States
  • Duration: 6 months
  • Physical and remote deployments
Back
No Comments

Sorry, the comment form is closed at this time.

Similar articles

Train timelapse icture

Java8 and Angular4, the right alliance in transports application development

The client wanted to replace 2 obsolete applications used to trace events occurring on their transportation network. A SharePoint based solution was proposed for document management together with a K2 BPM platform to handle all the processes of the application.
pexels-photo-136739

Migration of events logging applications for better team collaboration

The client wanted to replace 2 obsolete applications used to trace events occurring on their transportation network. A SharePoint based solution was proposed for document management together with a K2 BPM platform to handle all the processes of the application.
money-card-business-credit-card-50987

Improved Reporting for Personal Financing

The client's reporting system is not efficient. The mission was to find a solution to increase the performance of the business user.